CCNP Routing and Switching 642-813 SWITCH Practice Test Questions

CCNP routing and switching 642-813 SWITCH practice test questions are available. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.

Share 642-813 SWITCH practice test questions below.

hostname Switch1 interface Vlan10 ip address 172.16.10.32 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 700 standby 1 preempt hostname Switch2 interface Vlan10 ip address 172.16.10.33 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 750 standby 1 priority 110 standby 1 preempt hostname Switch3 interface Vlan10 ip address 172.16.10.34 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 750 standby 1 priority 150 standby 1 preempt Refer to the above.Three switches are configured for HSRP Switch1 remains in the HSRP listen state.What is the most likely cause of this status?
A.This is normal operation
B.The standby group number does not match de VLAN number
C.Ip addressing is incorrect
D.Priority commands are incorrect
E.Standby timers are incorrect
Answer: A

What is the result of entering the command port-channel load-balance src-dst-ip on an EtherChannel link?
A.Packets are distributed across the ports in the channel based on the source and destination MAC addresses
B.Packets are distributed across the ports in the channel based on both the source and destination IP addresses
C.Packets are balanced across the ports in the channel based first on the source MAC address, then on the destination MAC address, then on the IP address
D.Packets are distributed across the access ports in the channel based first on the source IP address and then on the destination IP addresses
Answer: B

When an attacker is using switch spoofing to perform VLAN hopping, how is the attacker able to gather information?
A.The attacking station uses DTP to negotiate trunking with a switch port and captures all traffic that is allowed on the trunk
B.The attacking station tags itself with all usable VLANs to capture data that is passed through the switch, regardless of the VLAN to which the data belongs
C.The attacking station generates frames with two 802.1Q headers to cause the switch to forward the frames to a VLAN that would be inaccessible to the attacker through legitimate means
D.The attacking station uses VTP to collect VLAN information that is sent out and then tags itself with the domain information to capture the data
Answer:A

Get more Cisco 642-813 SWITCH practice questions and answers here.

 

Posted on

642-813 SWITCH Implementing Cisco IP Switched Networks

Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP, and Cisco Certified Design Professional CCDP certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.

642-813 SWITCH is known as Implementing Cisco IP Switched Networks. The Associated Certifications are CCDP, CCNP Routing and Switching. There are 35-45 questions in real 642-813 SWITCH test, which will take the candidates 120 minutes to complete the test. The available language is English. Candidates can register 642-813 SWITCH exam at Pearson VUE testing center.

642-813 SWITCH exam objectives are also helpful in your preparation.

50% 1.0 Implement VLAN Based Solution, given a Network Design and a set of Requirements

1.1 Determine network resources needed for implementing a VLAN based solution on a network
1.2 Create a VLAN based implementation plan
1.3 Create a VLAN based verification plan
1.4 Configure switch-to-switch connectivity for the VLAN based solution
1.5 Configure loop prevention for the VLAN based solution
1.6 Verify EIGRP solution was implemented properly using show and debug commands

12% 2.0 Implement a Security Extension of a Layer 2 Solution, given a Network Design and a set of Requirements

2.1 Determine network resources needed for implementing a security solution
2.2 Create a implementation plan for the security solution
2.3 Create a verification plan for the security solution
2.4 Configure port security features
2.5 Configure general switch security features
2.6 Configure private VLANs
2.7 Configure VACL and PACL
2.8 Verify the Security based solution was implemented properly using show and debug commands
2.9 Document results of security implementation and verification

14% 3.0 Implement Switch Based Layer 3 Services, given a Network Design and a set of Requirements

3.1 Determine network resources needed for implementing a Switch based Layer 3 solution
3.2 Create an implementation plan for the Switch based Layer 3 solution
3.3 Create a verification plan for the Switch based Layer 3 solution
3.4 Configure routing interfaces
3.5 Configure Layer 3 Security
3.6 Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
3.7 Document results of Switch based Layer 3 implementation and verification

5% 4.0 Prepare infrastructure to Support Advanced Services

4.1 Implement a Wireless Extension of a Layer 2 solutio
4.2 Implement a VoIP support solution
4.3 Implement video support solution

19% 5.0 Implement High Availability, given a Network Design and a set of Requirements

5.1 Determine network resources needed for implementing High Availability on a network
5.2 Create a High Availability implementation plan
5.3 Create a High Availability verification plan
5.4 Implement first hop redundancy protocols
5.5 Implement switch supervisor redundancy
5.6 Verify High Availability solution was implemented properly using show and debug commands
5.7 Document results of High Availability implementation and verification

Exam Note: The latest day of 642-813 SWITCH to test is January 29, 2015. The new exam is 300-115 SWITCH, which begins January 30, 2015.