  • CCIE Security 350-018 exam will be retired on January 30, 2017, the new exam is 400-251.
  • CCNA Data Center 640-911 DCICN exam will be retired on April 11, 2017.
  • CCNA Data Center 640-916 DCICT exam will be retired on April 11, 2017.
  • CCNP Data Center 642-035 DCUCT exam will be retired on July 3, 2017.
  • CCNP Data Center 642-980 DCUFT exam will be retired on July 3, 2017.
  • CCNP Data Center 642-996 DCUFD exam will be retired on July 3, 2017.
  • CCNP Data Center 642-997 DCUFI exam will be retired on July 3, 2017.
  • CCNP Data Center 642-998 DCUCD exam will be retired on July 3, 2017.
  • CCNP Data Center 642-999 DCUCI exam will be retired on July 3, 2017.
  • The new CCNP Data Center certification required exams are 300-180 DCIT, 300-165 DCII, 300-160 DCID, 300-175 DCUCI and 300-170 DCVAI exams.

Tag Archives: 642-813 SWITCH test

04 Aug

642-813 SWITCH Implementing Cisco IP Switched Networks

Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP, and Cisco Certified Design Professional CCDP certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.

642-813 SWITCH is known as Implementing Cisco IP Switched Networks. The Associated Certifications are CCDP, CCNP Routing and Switching. There are 35-45 questions in real 642-813 SWITCH test, which will take the candidates 120 minutes to complete the test. The available language is English. Candidates can register 642-813 SWITCH exam at Pearson VUE testing center.

642-813 SWITCH exam objectives are also helpful in your preparation.

50% 1.0 Implement VLAN Based Solution, given a Network Design and a set of Requirements

1.1 Determine network resources needed for implementing a VLAN based solution on a network
1.2 Create a VLAN based implementation plan
1.3 Create a VLAN based verification plan
1.4 Configure switch-to-switch connectivity for the VLAN based solution
1.5 Configure loop prevention for the VLAN based solution
1.6 Verify EIGRP solution was implemented properly using show and debug commands

12% 2.0 Implement a Security Extension of a Layer 2 Solution, given a Network Design and a set of Requirements

2.1 Determine network resources needed for implementing a security solution
2.2 Create a implementation plan for the security solution
2.3 Create a verification plan for the security solution
2.4 Configure port security features
2.5 Configure general switch security features
2.6 Configure private VLANs
2.7 Configure VACL and PACL
2.8 Verify the Security based solution was implemented properly using show and debug commands
2.9 Document results of security implementation and verification

14% 3.0 Implement Switch Based Layer 3 Services, given a Network Design and a set of Requirements

3.1 Determine network resources needed for implementing a Switch based Layer 3 solution
3.2 Create an implementation plan for the Switch based Layer 3 solution
3.3 Create a verification plan for the Switch based Layer 3 solution
3.4 Configure routing interfaces
3.5 Configure Layer 3 Security
3.6 Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
3.7 Document results of Switch based Layer 3 implementation and verification

5% 4.0 Prepare infrastructure to Support Advanced Services

4.1 Implement a Wireless Extension of a Layer 2 solutio
4.2 Implement a VoIP support solution
4.3 Implement video support solution

19% 5.0 Implement High Availability, given a Network Design and a set of Requirements

5.1 Determine network resources needed for implementing High Availability on a network
5.2 Create a High Availability implementation plan
5.3 Create a High Availability verification plan
5.4 Implement first hop redundancy protocols
5.5 Implement switch supervisor redundancy
5.6 Verify High Availability solution was implemented properly using show and debug commands
5.7 Document results of High Availability implementation and verification

Exam Note: The latest day of 642-813 SWITCH to test is January 29, 2015. The new exam is 300-115 SWITCH, which begins January 30, 2015.

Related resource: http://www.cisco.com/web/learning/exams/list/switch.html#~Topics


Recent Posts


Tags

and/or Remove an End-Device and/or Remove an Infrastructure Device and/or Remove Cables (network and/or power) Cisco 642-997 DCUFI exam Cisco 642-999 DCUCI exam Configure Cisco Unity Connection Configure Cisco Unity Express using the GUI Describe and implement centralized call processing redundancy Describe Data Center Structure and Modularity Describe the Design Methodology Describe the Technologies used within the Data Center Describe WLAN Fundamentals Design and Deploy WLAN Infrastructure for Mobility Design Network Management Considerations into a Data Center Design the Access Layer of a Data Center General Networking Knowledge given a Network Design and a set of Requirements High Availability Routing Features Identify Cisco Equipment and Related Hardware Implement high availability features on Cisco Unified Fabric products in a Cisco Data Center Architecture Implement Multicast over Wireless Implement QoS for Wireless Applications Implement VoWLAN Infrastructure Security Infrastructure Services Install Integrate Client Device Security IP Services LAN Switching Technologies Layer 2 Technologies Layer 3 Technologies Maintain Appropriate End-Devices and Industrial Network Infrastructure Devices Manage the Unified Fabric in a Cisco Data Center Architecture Monitoring and Reporting Tools Network Principles Replace Service-Related Knowledge Threat Defense Threat Defense Architectures Troubleshoot Call Setup Issues Troubleshooting Troubleshoot Registration Issues UCS Compute Troubleshooting VPN Technologies WAN Technologies