Note:

  • The new CCNP Data Center certification required exams are 300-180 DCIT, 300-165 DCII, 300-160 DCID, 300-175 DCUCI and 300-170 DCVAI exams.
  • The last day to test Cisco 810-403 OUTCOMES exam is December 29, 2017.
  • The last day to test Cisco 820-424 BTASBVA exam is December 29, 2017.

Category Archives: 642-813 SWITCH Exam

04 Dec

ccnp 642-813 switch exam preparation

ccnp 642-813 switch exam preparation is available, which is helpful for the candidates to prepare the test well. Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP, and Cisco Certified Design Professional CCDP certifications.

The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture. Cisco 642-813 SWITCH exam objectives are as follows.

12% 2.0 Implement a Security Extension of a Layer 2 Solution, given a Network Design and a set of Requirements

2.1 Determine network resources needed for implementing a security solution
2.2 Create a implementation plan for the security solution
2.3 Create a verification plan for the security solution
2.4 Configure port security features
2.5 Configure general switch security features
2.6 Configure private VLANs
2.7 Configure VACL and PACL
2.8 Verify the Security based solution was implemented properly using show and debug commands
2.9 Document results of security implementation and verification

14% 3.0 Implement Switch Based Layer 3 Services, given a Network Design and a set of Requirements

3.1 Determine network resources needed for implementing a Switch based Layer 3 solution
3.2 Create an implementation plan for the Switch based Layer 3 solution
3.3 Create a verification plan for the Switch based Layer 3 solution
3.4 Configure routing interfaces
3.5 Configure Layer 3 Security
3.6 Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
3.7 Document results of Switch based Layer 3 implementation and verification

Practice ccnp 642-813 switch exam preparation online here.

 

 

11 Sep

CCNP Routing and Switching 642-813 SWITCH Practice Test Questions

CCNP routing and switching 642-813 SWITCH practice test questions are available. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.

Share 642-813 SWITCH practice test questions below.

hostname Switch1 interface Vlan10 ip address 172.16.10.32 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 700 standby 1 preempt hostname Switch2 interface Vlan10 ip address 172.16.10.33 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 750 standby 1 priority 110 standby 1 preempt hostname Switch3 interface Vlan10 ip address 172.16.10.34 255.255.255.0 no ip redirects standby 1 ip 172.16.10.110 standby 1 timers msec 200 msec 750 standby 1 priority 150 standby 1 preempt Refer to the above.Three switches are configured for HSRP Switch1 remains in the HSRP listen state.What is the most likely cause of this status?
A.This is normal operation
B.The standby group number does not match de VLAN number
C.Ip addressing is incorrect
D.Priority commands are incorrect
E.Standby timers are incorrect
Answer: A

What is the result of entering the command port-channel load-balance src-dst-ip on an EtherChannel link?
A.Packets are distributed across the ports in the channel based on the source and destination MAC addresses
B.Packets are distributed across the ports in the channel based on both the source and destination IP addresses
C.Packets are balanced across the ports in the channel based first on the source MAC address, then on the destination MAC address, then on the IP address
D.Packets are distributed across the access ports in the channel based first on the source IP address and then on the destination IP addresses
Answer: B

When an attacker is using switch spoofing to perform VLAN hopping, how is the attacker able to gather information?
A.The attacking station uses DTP to negotiate trunking with a switch port and captures all traffic that is allowed on the trunk
B.The attacking station tags itself with all usable VLANs to capture data that is passed through the switch, regardless of the VLAN to which the data belongs
C.The attacking station generates frames with two 802.1Q headers to cause the switch to forward the frames to a VLAN that would be inaccessible to the attacker through legitimate means
D.The attacking station uses VTP to collect VLAN information that is sent out and then tags itself with the domain information to capture the data
Answer:A

Get more Cisco 642-813 SWITCH practice questions and answers here.

 

03 Sep

Paths of Getting CCNP Routing and Switching Certified

Cisco Certified Network Professional (CCNP) Routing and Switching certification validates the ability to plan, implement, verify and troubleshoot local and wide-area enterprise networks and work collaboratively with specialists on advanced security, voice, wireless and video solutions. The CCNP Routing and Switching certification is appropriate for those with at least one year of networking experience who are ready to advance their skills and work independently on complex network solutions.

Those who achieve CCNP Routing and Switching have demonstrated the skills required in enterprise roles such as network engineer, support engineer, systems engineer or network technician. The routing and switching protocol knowledge from this certification will provide a lasting foundation as these skills are equally relevant in the physical networks of today and the virtualized network functions of tomorrow.

In the CCNP Routing and Switching program, you will cover:

Implementing secure, IPv6-enabled LAN and WAN routing solutions to support today’s business-critical services and widespread adoption of BYOD across the enterprise
High availability, switch virtualization and scalable VPN technologies needed to support branch offices and to enable the mobile workforce

Two Paths to Certification
Option 1
If you are currently pursuing your CCNP Routing and Switching certification, you may choose to complete the v1.0 curriculum. Upon completion, the certification will be good for three years. The last day to test is January 29, 2015.
642-902 ROUTE
642-813 SWITCH
642-832 TSHOOT

Option 2
If you have not yet started pursuing the CCNP Routing and Switching certification or if you have only taken one of the three v1.0 exams, we recommend that you pursue the v2.0 certification.
300-101 ROUTE
300-115 SWITCH
300-135 TSHOOT

 

05 Aug

300-115 SWITCH Online Test-Implementing Cisco IP Switched Networks

Currently, our 300-115 SWITCH online test only provide 20 questions. Answer one question correctly, you can get 5 points. The content of these questions are the latest exam content. Please feel free to test your skill level.

If you have some opinions or suggestions about our online test, please leave your message, we will improve it step by step.

Now, begin to test:

VTP is configured on switch R1. Which of the following features were added in VTP version 2 that were not previously supported in VTP version 1? (Select two)

 
 
 
 
 

The Company network administrator needs to enable VTP pruning within the Company network. What action should a network administrator take to enable VTP pruning on an entire management domain?

 
 
 
 
 

The Company switches have all been upgraded to use VTP version 2. What are two benefits provided in VTP Version 2 that are not available in VTP Version 1? (Select two)

 
 
 
 
 

You want to configure switch R1 to propagate VLAN information across the Company network using VTP. What must be configured on a Cisco switch in order to advertise VLAN information?

 
 
 
 
 
 

R1 and R2 are switches that communicate via VTP. What is the default VTP advertisement intervals in Catalyst switches that are in server or client mode?

 
 
 
 
 
 

You need to investigate a VTP problem between two Company switches. The lack of which two prevents VTP information from propagating between switches? (Select two)

 
 
 
 
 

Two Company switches are connected via a trunk using VTP. Which VTP information does a Catalyst switch advertise on its trunk ports when using VTP? (Select two)

 
 
 
 
 

What is a characteristic of assigning a static VLAN membership?

 
 
 
 

The VLANs in switch R1 are being modified. Which of the following are updated in R1 every time a VLAN is modified? (Select all that apply)

 
 
 
 
 

You are assigning VLANs to the ports of switch R1. What VLAN number value is an assigned to the default VLAN?

 
 
 
 
 

In the three-layer hierarchical network design model; what’s associated with the access layer? (Select two)

 
 
 
 
 
 

The Company LAN switches are being configured to support the use of Dynamic VLANs. What should be considered when implementing a dynamic VLAN solution? (Select two)

 
 
 
 

The Company LAN switches are being configured to support the use of Dynamic VLANs. Which of the following are true of dynamic VLAN membership? (Select all that apply)

 
 
 
 
 

The Company LAN is becoming saturated with broadcasts and multicast traffic. What could you do to help a network with many multicasts and broadcasts?

 
 
 
 
 

Which of the following statements is true about the 80/20 rule (Select all that apply)?

 
 
 
 

What are some virtues of implementing end-to-end VLANs? (Choose two)

 
 
 
 

If you needed to transport traffic coming from multiple VLANs (connected between switches), and your CTO was insistent on using an open standard, which protocol would you use?

 
 
 
 
 
 

Which two statements are true about best practices in VLAN design? (Choose two.)

 
 
 
 
 

Which method of Layer 3 switching uses a forwarding information base (FIB)?

 
 
 
 
 

What is needed to verify that a newly implemented security solution is performing as expected?

 
 
 
 

Question 1 of 20

 

cart

 

 

 

05 Aug

300-115 SWITCH Implementing Cisco IP Switched Networks

Implementing Cisco IP Switched Networks (SWITCH 300-115) is a qualifying exam for the Cisco CCNP Routing and Switching and CCDP certifications. The SWITCH 300-115 exam certifies the switching knowledge and skills of successful candidates. They are certified in planning, configuring, and verifying the implementation of complex enterprise switching solutions that use the Cisco Enterprise Campus Architecture.

Implementing Cisco IP Switched Networks is the full name of 300-115 SWITCH test. The Associated Certifications are CCNP Routing and Switching, CCDP. There are 45-65 questions in real Cisco 300-115 SWITCH exam, which will take the candidates 120 minutes to complete the test. The available language is English. Candidates can register Cisco 300-115 SWITCH exam at Pearson VUE testing center.

Cisco 300-115 SWITCH exam objectives are as follows.

65% 1.0 Layer 2 Technologies

1.1 Configure and verify switch administration
1.1.a SDM templates
1.1.b Managing MAC address table
1.1.c Troubleshoot Err-disable recovery
1.2 Configure and verify Layer 2 protocols
1.2.a CDP, LLDP
1.2.b 1.2.b UDLD
1.3 Configure and verify VLANs
1.3.a Access ports
1.3.b VLAN database
1.3.c Normal, extended VLAN, voice VLAN
1.4 Configure and verify trunking
1.4.a VTPv1, VTPv2, VTPv3, VTP pruning
1.4.b dot1Q
1.4.c Native VLAN
1.4.d Manual pruning
1.5 Configure and verify EtherChannels
1.5.a LACP, PAgP, manual
1.5.b Layer 2, Layer 3
1.5.c Load balancing
1.5.d EtherChannel misconfiguration guard
1.6 Configure and verify spanning tree
1.6.a PVST+, RPVST+, MST
1.6.b Switch priority, port priority, path cost, STP timers
1.6.c PortFast, BPDUguard, BPDUfilter
1.6.d Loopguard and Rootguard
1.7 Configure and verify other LAN switching technologies
1.7.a PAN, RSPAN
1.8 Describe chassis virtualization and aggregation technologies
1.8.a Stackwise

20% 2.0 Infrastructure Security

2.1 Configure and verify switch security features
2.1.a DHCP snooping
2.1.b IP Source Guard
2.1.c Dynamic ARP inspection
2.1.d Port security
2.1.e Private VLAN
2.1.f Storm controls
2.2 Describe device security using Cisco IOS AAA with TACACS+ and RADIUS
2.2.a AAA with TACACS+ and RADIUS
2.2.b Local privilege authorization fallback

15% 3.0 Infrastructure Services

3.1 3Configure and verify first-hop redundancy protocols
3.1.a HSRP
3.1.b VRRP
3.1.c GLBP

Exam Note: 300-115 SWITCH is new exam instead of 642-813 SWITCH, which begins January 30, 2015.

Related resource: http://www.cisco.com/web/learning/exams/list/switch2.html#~Topics

 

 

 

05 Aug

642-813 SWITCH Online Test-Implementing Cisco IP Switched Networks

Currently, our 642-813 SWITCH online test only provide 10 questions. Answer one question correctly, you can get 10 points. The content of these questions are the latest exam content. Please feel free to test your skill level.

If you have some opinions or suggestions about our online test, please leave your message, we will improve it step by step.

Now, begin to test:

Please go to 642-813 SWITCH Online Test-Implementing Cisco IP Switched Networks to view the test

 

 

cart

 

04 Aug

642-813 SWITCH Implementing Cisco IP Switched Networks

Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP, and Cisco Certified Design Professional CCDP certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco’s Campus Enterprise Architecture.

642-813 SWITCH is known as Implementing Cisco IP Switched Networks. The Associated Certifications are CCDP, CCNP Routing and Switching. There are 35-45 questions in real 642-813 SWITCH test, which will take the candidates 120 minutes to complete the test. The available language is English. Candidates can register 642-813 SWITCH exam at Pearson VUE testing center.

642-813 SWITCH exam objectives are also helpful in your preparation.

50% 1.0 Implement VLAN Based Solution, given a Network Design and a set of Requirements

1.1 Determine network resources needed for implementing a VLAN based solution on a network
1.2 Create a VLAN based implementation plan
1.3 Create a VLAN based verification plan
1.4 Configure switch-to-switch connectivity for the VLAN based solution
1.5 Configure loop prevention for the VLAN based solution
1.6 Verify EIGRP solution was implemented properly using show and debug commands

12% 2.0 Implement a Security Extension of a Layer 2 Solution, given a Network Design and a set of Requirements

2.1 Determine network resources needed for implementing a security solution
2.2 Create a implementation plan for the security solution
2.3 Create a verification plan for the security solution
2.4 Configure port security features
2.5 Configure general switch security features
2.6 Configure private VLANs
2.7 Configure VACL and PACL
2.8 Verify the Security based solution was implemented properly using show and debug commands
2.9 Document results of security implementation and verification

14% 3.0 Implement Switch Based Layer 3 Services, given a Network Design and a set of Requirements

3.1 Determine network resources needed for implementing a Switch based Layer 3 solution
3.2 Create an implementation plan for the Switch based Layer 3 solution
3.3 Create a verification plan for the Switch based Layer 3 solution
3.4 Configure routing interfaces
3.5 Configure Layer 3 Security
3.6 Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
3.7 Document results of Switch based Layer 3 implementation and verification

5% 4.0 Prepare infrastructure to Support Advanced Services

4.1 Implement a Wireless Extension of a Layer 2 solutio
4.2 Implement a VoIP support solution
4.3 Implement video support solution

19% 5.0 Implement High Availability, given a Network Design and a set of Requirements

5.1 Determine network resources needed for implementing High Availability on a network
5.2 Create a High Availability implementation plan
5.3 Create a High Availability verification plan
5.4 Implement first hop redundancy protocols
5.5 Implement switch supervisor redundancy
5.6 Verify High Availability solution was implemented properly using show and debug commands
5.7 Document results of High Availability implementation and verification

Exam Note: The latest day of 642-813 SWITCH to test is January 29, 2015. The new exam is 300-115 SWITCH, which begins January 30, 2015.

Related resource: http://www.cisco.com/web/learning/exams/list/switch.html#~Topics


Recent Posts


Tags

and/or Remove an End-Device and/or Remove an Infrastructure Device and/or Remove Cables (network and/or power) Cisco 642-997 DCUFI exam Cisco 642-999 DCUCI exam Configure Cisco Unity Connection Configure Cisco Unity Express using the GUI Describe and implement centralized call processing redundancy Describe Data Center Structure and Modularity Describe the Design Methodology Describe the Technologies used within the Data Center Describe WLAN Fundamentals Design and Deploy WLAN Infrastructure for Mobility Design Network Management Considerations into a Data Center Design the Access Layer of a Data Center General Networking Knowledge given a Network Design and a set of Requirements High Availability Routing Features Identify Cisco Equipment and Related Hardware Implement high availability features on Cisco Unified Fabric products in a Cisco Data Center Architecture Implement Multicast over Wireless Implement QoS for Wireless Applications Implement VoWLAN Infrastructure Security Infrastructure Services Install Integrate Client Device Security IP Services LAN Switching Technologies Layer 2 Technologies Layer 3 Technologies Maintain Appropriate End-Devices and Industrial Network Infrastructure Devices Manage the Unified Fabric in a Cisco Data Center Architecture Monitoring and Reporting Tools Network Principles Replace Service-Related Knowledge Threat Defense Threat Defense Architectures Troubleshoot Call Setup Issues Troubleshooting Troubleshoot Registration Issues UCS Compute Troubleshooting VPN Technologies WAN Technologies

Links

Powered by CCNP Exams Test Base